{"id":25755,"date":"2025-02-10T09:45:09","date_gmt":"2025-02-10T08:45:09","guid":{"rendered":"https:\/\/www.hjort.no\/?p=25755"},"modified":"2026-03-10T09:45:25","modified_gmt":"2026-03-10T08:45:25","slug":"new-limit-for-solar-power-plants-requiring-a-licence","status":"publish","type":"post","link":"https:\/\/www.hjort.no\/en\/new-limit-for-solar-power-plants-requiring-a-licence\/","title":{"rendered":"New Limit for Solar Power Plants Requiring a Licence"},"content":{"rendered":"<h2>Briefly about the new limit<\/h2>\n<p>The new limit means that a licence under the Energy Act is only required for solar power plants with an installed capacity of 10 MW or more. Plants that are smaller than this do not need a licence under the Energy Act. Instead, such plants must be processed by the municipality in accordance with the rules in the Planning and Building Act.<\/p>\n<h2>The background to the new limit<\/h2>\n<p>Under the current regulations, the voltage level of the electrical system determines whether solar power plants need a licence under the Energy Act. As the voltage level can vary between plants with similar physical dimensions and environmental effects, the current regulations can lead to random effects and a lack of equal treatment. The purpose of the rule change is to establish clearer and less random criteria for the licence obligation. The Ministry of Energy also emphasises that the change is beneficial because it gives local authorities greater influence and frees up case processing capacity at NVE.<\/p>\n<h2>Practical consequences<\/h2>\n<p>The new limit means that developers of solar power plants with an installed capacity of less than 10 MW only need to deal with the municipality, not NVE. In practice, this will be the case for most roof-mounted solar power plants. Developers of solar power plants with an installed capacity of more than 10 MW must still apply for a licence under the Energy Act from the NVE. This will be particularly relevant for larger ground-mounted solar power.<\/p>\n<h2>Questions about the development of solar power plants?<\/h2>\n<p>Advokatfirmaet Hjort has the experience and knowledge to help at all stages of the process of developing solar power plants.<\/p>\n","protected":false},"excerpt":{"rendered":"<p class=\"lead\">In a press release dated 8 February 2025, the Ministry of Energy announces that, with effect from 1 July 2025, there will be a new limit for which solar power plants require a licence under the Energy Act. The new limit is 10 MW installed capacity.<\/p>\n","protected":false},"author":25,"featured_media":21233,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[42],"tags":[],"class_list":["post-25755","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-business-law"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>New Limit for Solar Power Plants Requiring a Licence - Hjort<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.hjort.no\/en\/new-limit-for-solar-power-plants-requiring-a-licence\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"New Limit for Solar Power Plants Requiring a Licence - Hjort\" \/>\n<meta property=\"og:description\" content=\"In a press release dated 8 February 2025, the Ministry of Energy announces that, with effect from 1 July 2025, there will be a new limit for which solar power plants require a licence under the Energy Act. The new limit is 10 MW installed capacity.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.hjort.no\/en\/new-limit-for-solar-power-plants-requiring-a-licence\/\" \/>\n<meta property=\"og:site_name\" content=\"Hjort\" \/>\n<meta property=\"article:published_time\" content=\"2025-02-10T08:45:09+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-03-10T08:45:25+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.hjort.no\/wp-content\/uploads\/zbynek-burival-V4ZYJZJ3W4M-unsplash-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2048\" \/>\n\t<meta property=\"og:image:height\" content=\"1356\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Hanna Helli\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Hanna Helli\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.hjort.no\\\/en\\\/new-limit-for-solar-power-plants-requiring-a-licence\\\/\",\"url\":\"https:\\\/\\\/www.hjort.no\\\/en\\\/new-limit-for-solar-power-plants-requiring-a-licence\\\/\",\"name\":\"New Limit for Solar Power Plants Requiring a Licence - Hjort\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.hjort.no\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.hjort.no\\\/en\\\/new-limit-for-solar-power-plants-requiring-a-licence\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.hjort.no\\\/en\\\/new-limit-for-solar-power-plants-requiring-a-licence\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.hjort.no\\\/wp-content\\\/uploads\\\/zbynek-burival-V4ZYJZJ3W4M-unsplash-scaled.jpg\",\"datePublished\":\"2025-02-10T08:45:09+00:00\",\"dateModified\":\"2026-03-10T08:45:25+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.hjort.no\\\/#\\\/schema\\\/person\\\/1b9774a8c052a90b0eb9ea3a64d210f2\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.hjort.no\\\/en\\\/new-limit-for-solar-power-plants-requiring-a-licence\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.hjort.no\\\/en\\\/new-limit-for-solar-power-plants-requiring-a-licence\\\/\"]}],\"publisher\":{\"@id\":\"https:\\\/\\\/www.hjort.no\\\/#legalservice\"}},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.hjort.no\\\/en\\\/new-limit-for-solar-power-plants-requiring-a-licence\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.hjort.no\\\/wp-content\\\/uploads\\\/zbynek-burival-V4ZYJZJ3W4M-unsplash-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/www.hjort.no\\\/wp-content\\\/uploads\\\/zbynek-burival-V4ZYJZJ3W4M-unsplash-scaled.jpg\",\"width\":2048,\"height\":1356},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.hjort.no\\\/en\\\/new-limit-for-solar-power-plants-requiring-a-licence\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Hjem\",\"item\":\"https:\\\/\\\/www.hjort.no\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"New Limit for Solar Power Plants Requiring a Licence\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.hjort.no\\\/#website\",\"url\":\"https:\\\/\\\/www.hjort.no\\\/\",\"name\":\"Hjort\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.hjort.no\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"New Limit for Solar Power Plants Requiring a Licence - Hjort","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.hjort.no\/en\/new-limit-for-solar-power-plants-requiring-a-licence\/","og_locale":"en_US","og_type":"article","og_title":"New Limit for Solar Power Plants Requiring a Licence - Hjort","og_description":"In a press release dated 8 February 2025, the Ministry of Energy announces that, with effect from 1 July 2025, there will be a new limit for which solar power plants require a licence under the Energy Act. The new limit is 10 MW installed capacity.","og_url":"https:\/\/www.hjort.no\/en\/new-limit-for-solar-power-plants-requiring-a-licence\/","og_site_name":"Hjort","article_published_time":"2025-02-10T08:45:09+00:00","article_modified_time":"2026-03-10T08:45:25+00:00","og_image":[{"width":2048,"height":1356,"url":"https:\/\/www.hjort.no\/wp-content\/uploads\/zbynek-burival-V4ZYJZJ3W4M-unsplash-scaled.jpg","type":"image\/jpeg"}],"author":"Hanna Helli","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Hanna Helli","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.hjort.no\/en\/new-limit-for-solar-power-plants-requiring-a-licence\/","url":"https:\/\/www.hjort.no\/en\/new-limit-for-solar-power-plants-requiring-a-licence\/","name":"New Limit for Solar Power Plants Requiring a Licence - Hjort","isPartOf":{"@id":"https:\/\/www.hjort.no\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.hjort.no\/en\/new-limit-for-solar-power-plants-requiring-a-licence\/#primaryimage"},"image":{"@id":"https:\/\/www.hjort.no\/en\/new-limit-for-solar-power-plants-requiring-a-licence\/#primaryimage"},"thumbnailUrl":"https:\/\/www.hjort.no\/wp-content\/uploads\/zbynek-burival-V4ZYJZJ3W4M-unsplash-scaled.jpg","datePublished":"2025-02-10T08:45:09+00:00","dateModified":"2026-03-10T08:45:25+00:00","author":{"@id":"https:\/\/www.hjort.no\/#\/schema\/person\/1b9774a8c052a90b0eb9ea3a64d210f2"},"breadcrumb":{"@id":"https:\/\/www.hjort.no\/en\/new-limit-for-solar-power-plants-requiring-a-licence\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.hjort.no\/en\/new-limit-for-solar-power-plants-requiring-a-licence\/"]}],"publisher":{"@id":"https:\/\/www.hjort.no\/#legalservice"}},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.hjort.no\/en\/new-limit-for-solar-power-plants-requiring-a-licence\/#primaryimage","url":"https:\/\/www.hjort.no\/wp-content\/uploads\/zbynek-burival-V4ZYJZJ3W4M-unsplash-scaled.jpg","contentUrl":"https:\/\/www.hjort.no\/wp-content\/uploads\/zbynek-burival-V4ZYJZJ3W4M-unsplash-scaled.jpg","width":2048,"height":1356},{"@type":"BreadcrumbList","@id":"https:\/\/www.hjort.no\/en\/new-limit-for-solar-power-plants-requiring-a-licence\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Hjem","item":"https:\/\/www.hjort.no\/en\/"},{"@type":"ListItem","position":2,"name":"New Limit for Solar Power Plants Requiring a Licence"}]},{"@type":"WebSite","@id":"https:\/\/www.hjort.no\/#website","url":"https:\/\/www.hjort.no\/","name":"Hjort","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.hjort.no\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/www.hjort.no\/en\/wp-json\/wp\/v2\/posts\/25755","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.hjort.no\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.hjort.no\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.hjort.no\/en\/wp-json\/wp\/v2\/users\/25"}],"replies":[{"embeddable":true,"href":"https:\/\/www.hjort.no\/en\/wp-json\/wp\/v2\/comments?post=25755"}],"version-history":[{"count":1,"href":"https:\/\/www.hjort.no\/en\/wp-json\/wp\/v2\/posts\/25755\/revisions"}],"predecessor-version":[{"id":25756,"href":"https:\/\/www.hjort.no\/en\/wp-json\/wp\/v2\/posts\/25755\/revisions\/25756"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.hjort.no\/en\/wp-json\/wp\/v2\/media\/21233"}],"wp:attachment":[{"href":"https:\/\/www.hjort.no\/en\/wp-json\/wp\/v2\/media?parent=25755"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.hjort.no\/en\/wp-json\/wp\/v2\/categories?post=25755"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.hjort.no\/en\/wp-json\/wp\/v2\/tags?post=25755"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}